Dacorum Local Plan to 2041 - Core Documents and Supporting Evidence
To support the preparation of the Dacorum Local Plan to 2041, we have prepared an extensive evidence base. Please click here to view the full core documents and evidence library. Alternatively you can view evidence studies by topic by opening the relevant folder on this page.
Accessibility
Please note: some of our PDF documents may not be suitable for users of assistive technology. Please contact the Strategic Planning team if you require an alternative format.
To support the preparation of the Dacorum Local Plan to 2041, we have prepared an extensive evidence base. Please click here to view the full core documents and evidence library. Alternatively you can view evidence studies by topic by opening the relevant folder on this page.
Accessibility
Please note: some of our PDF documents may not be suitable for users of assistive technology. Please contact the Strategic Planning team if you require an alternative format.
See Full Evidence Library
Core Documents and Evidence Library
-
Core Documents (CD)
- CD01.1 Dacorum Local Plan to 2041: Pre Submission Version (Nov 2024) (12.5 MB) (pdf)
- CD02.1 Submission Policies Map (Nov 2024) (39.4 MB) (pdf)
- CD02.2 Submission Policies Mapbook (Nov 2024) (1.33 MB) (pdf)
- CD03.1 Sustainability Appraisal of the Dacorum Local Plan (Oct 2024) (7.57 MB) (pdf)
- CD03.2 Sustainability Appraisal of the Dacorum Local Plan Non-Technical Summary (Oct 2024) (1.61 MB) (pdf)
- CD04.1 Revised Strategy for Growth Sustainability Appraisal (SA) of the Dacorum Local Plan: Interim SA Report (Oct 2023)
- CD04.2 Revised Strategy for Growth Sustainability Appraisal (SA) of the Dacorum Local Plan Interim SA Report Non-Technical Summary (Oct 2023)
- CD05.1 Emerging Strategy for Growth Interim Sustainability Appraisal Report (Nov 2020)
- CD06.1 Habitats Regulations Assessment of the Dacorum Local Plan Pre-Submission (Oct 2024) (13.1 MB) (pdf)
- CD07.1 Revised Strategy for Growth Dacorum Local Plan (2024-2040) Habitats Regulations Assessment (Sep 2023)
- CD08.1 Emerging Strategy for Growth Habitats Regulation Assessment Report (May 2021)
- CD08.2 HRA Desk Study and Site Walkover Survey of the Chilterns Beechwoods SAC: Ashridge Commons and Woods SSSI and Tring Woodlands SSSI components (May 2021)
- CD09.1 Revised Strategy for Growth Local Plan Viability Update (Oct 2023)
- CD09.2 Revised Strategy for Growth Local Plan Viability Update Appendices (Aug 2023)
- CD09.3 Regulation 19 Viability Note (Sep 2024) (848 KB) (pdf)
- CD10.1 Consultation Summary Report Emerging Strategy for Growth Dacorum Local Plan (2020-2038) (Jun 2021)
- CD11.1 Consultation Report Revised Strategy for Growth Local Plan 2024-2040 (Mar 2024) (1.9 MB) (pdf)
- CD12.1 Summary of Changes to the Spatial Strategy and Site Allocations (November 2024) (4.02 MB) (pdf)
- CD13.1 Summary of Other Main Changes to Dacorum Local Plan to 2041 (November 2024) (1.01 MB) (pdf)
-
Previous Consultation Documents (PCD)
- PCD01.1 Revised Strategy for Growth Consultation Dacorum Local Plan (2024-2040) (Oct 2023)
- PCD02.1 Emerging Strategy for Growth Dacorum Local Plan (2020-2038) Part 1 (Nov 2020)
- PCD02.2 Emerging Strategy for Growth Dacorum Local Plan (2020-2038) Part 2 (Nov 2020)
- PCD02.3 Emerging Strategy for Growth Dacorum Local Plan (2020-2038) Part 3 (Nov 2020)
- PCD02.4 Emerging Strategy for Growth Dacorum Local Plan (2020-2038) Part 4 (Nov 2020)
- PCD03.1 Emerging Strategy for Growth Consultation Dacorum Local Plan 2020 to 2038 (Nov 2020)
- PCD04.1 Emerging Strategy for Growth The Development Strategy Background Topic Paper (Nov 2020)
- PCD05.1 Emerging Strategy for Growth Site Selection Topic Paper: Main Report (Nov 2020)
- PCD05.2 Emerging Strategy for Growth Site Selection Topic Paper: Appendix A Summary of Site Selection (Nov 2020)
- PCD05.3 Emerging Strategy for Growth Site Selection Topic Paper: Appendix B Sites for Detailed Testing (Nov 2020)
- PCD06.1 Emerging Strategy for Growth Topic Paper for the Chilterns Beechwoods SAC: Main Report (Nov 2020)
- PCD06.2 Emerging Strategy for Growth Topic Paper for the Chilterns Beechwoods SAC: Summary of evidence (Nov 2020)
- PCD06.3 Emerging Strategy for Growth Topic Paper Chilterns Beechwoods SAC: Appendices 1 to 16 (Nov 2020)
- PCD06.4 Emerging Strategy for Growth Topic Paper Chilterns Beechwoods SAC: Appendices 17 to 19 (Nov 2020)
- PCD06.5 Emerging Strategy for Growth Topic Paper Chilterns Beechwoods SAC: Appendices 20 to 21 (Nov 2020)
- PCD06.6 Emerging Strategy for Growth Topic Paper Chilterns Beechwoods SAC: Appendix 22 Part 1 (Nov 2020)
- PCD06.7 Emerging Strategy for Growth Topic Paper Chilterns Beechwoods SAC: Appendix 22 part 2 (Nov 2020)
- PCD06.8 Emerging Strategy for Growth Topic Paper Chilterns Beechwoods SAC: Appendix 22 Part 3 (Nov 2020)
- PCD06.9 Emerging Strategy for Growth Topic Paper Chilterns Beechwoods SAC: Appendices 23 to 26 (Nov 2020)
- PCD07.1 Emerging Strategy for Growth Housing: Policy Background Topic Paper (Nov 2020)
- PCD08.1 Emerging Strategy for Growth Transport Evidence Base Topic Paper (Nov 2020)
- PCD09.1 Emerging Strategy for Growth Climate Change and Sustainability Background Topic Paper (Nov 2020)
- PCD10.1 Emerging Strategy for Growth Open Space, Sport and Leisure Background Topic Paper (Nov 2020)
- PCD11.1 Emerging Strategy for Growth Employment Development Background Topic Paper (Nov 2020)
- PCD12.1 Emerging Strategy for Growth The Green Belt and Rural Area Background Topic Paper (Nov 2020)
- PCD12.2 Emerging Strategy for Growth Topic Paper Green Belt and Rural Area Appendix A: Green Belt Summarising Document (Nov 2020)
- PCD12.3 Emerging Strategy for Growth Topic Paper Green Belt and Rural Area Appendix B: Dismissed Growth Options through Issues and Options 2017 (Nov 2020)
- PCD13.1 Emerging Strategy for Growth Retail and Town Centres Background Topic Paper (Nov 2020)
-
Hemel Garden Communities (HGC)
- HGC01.1 Hemel Garden Communities (HGC) Delivery Statement (Sep 2024) (18.6 MB) (pdf)
- HGC02.1 Hemel Garden Communities Framework Plan (Sep 2024) (19.2 MB) (pdf)
- HGC02.2 Hemel Garden Communities Framework Plan Evidence Base Report (Sep 2024) (14.3 MB) (pdf)
- HGC02.3 Hemel Garden Communities Framework Plan Evidence Base Report Appendices (Sep 2024) (4.11 MB) (pdf)
- HGC03.1 Hemel Garden Communities Strategic Design Code - Draft (Sep 2024)
- HGC04.1 Hemel Garden Communities 2050 Transport Vision & Strategy Executive Summary (Feb 2024)
- HGC04.2 Hemel Garden Communities 2050 Transport Vision & Strategy v3.4 Endorsed by Hertfordshire County Council (Mar 2024)
- HGC05.1 Hemel Garden Communities Modal Shift Final Draft Report (2023)
- HGC05.2 Hemel Garden Communities Potential Modal Shift Executive Summary (2023)
- HGC06.1 Hemel Hempstead New Town Historic Context Study (May 2023)
- HGC07.1 North Hemel Hempstead Landscape Assessment Main Report Final REV E (Sep 2024)
- HGC07.2 North Hemel Hempstead Landscape Assessment Appendix A: Key Viewpoint Photographs (Sep 2024)
- HGC07.3 North Hemel Hempstead Landscape Assessment Appendix B: Landscape Sensitivity (Sep 2024)
- HGC07.4 North Hemel Hempstead Landscape Assessment Appendix C: Wireframe Testing (Sep 2024)
- HGC07.5 North Hemel Hempstead Landscape Assessment Appendix D: Stage 2 Green Belt Review Scores (Sep 2024)
- HGC08.1 Hemel Garden Communities Green Infrastructure Strategy - Draft (Jul 2024)
- HGC09.1 Hemel Hempstead Socio-Economic and Demography Study (May 2024)
- HGC10.1 Hemel: Higher Education Opportunities Study Stage 2 Report (Jul 2024)
- Settlement Hierarchy (SET)
-
Housing Delivery (HOU)
- HOU01.1 South West Herts Local Housing Needs Assessment Update Final Report (Mar 2024) (2.6 MB) (pdf)
- HOU01.2 South West Herts Local Housing Needs Assessment Update Appendices (Mar 2024) (585 KB) (pdf)
- HOU02.1 South West Hertfordshire Local Housing Needs Assessment Final Report (Sep 2020)
- HOU03.1 Self and Custom Housebuilding Study Technical Report (Apr 2024) (726 KB) (pdf)
- HOU04.1 Custom and Self Build Demand Assessment Framework Final Report (Jan 2020)
- HOU05.1 Gypsy and Traveller Accommodation Assessment (GTAA) (Sep 2024) (1.64 MB) (pdf)
- HOU06.1 Gypsy and Traveller Accommodation Assessment Final Report (Mar 2019)
- HOU07.1 Nationally Described Space Standards Review Evidence Paper (Jul 2024) (660 KB) (pdf)
- HOU08.1 South West Hertfordshire Strategic Housing Market Assessment Final Report (Jan 2016)
- HOU08.2 South West Hertfordshire Strategic Housing Market Assessment: Executive Summary (Jan 2016)
- HOU08.3 South West Hertfordshire Strategic Housing Market Assessment Appendices (Jan 2016)
-
Economy (ECN)
- ECN01.1 Dacorum Retail Study Update (Sep 2024) (19 MB) (pdf)
- ECN02.1 Further Dacorum Retail Study (Jun 2020)
- ECN02.2 Retail Study Survey Information (Jun 2020)
- ECN03.1 South West Hertfordshire Economic Study (Sep 2024) (5.12 MB) (pdf)
- ECN04.1 South West Herts Economic Study Update Final Report (Sep 2019)
- ECN05.1 South West Hertfordshire Economic Study Final Report (Feb 2016)
- ECN06.1 South West Hertfordshire Retail and Leisure Study (Sep 2018)
- ECN06.2 South West Hertfordshire Retail and Leisure Study Appendices A: Study Area and Zones and B: Centre Plans (Sep 2018)
- ECN06.3 South West Hertfordshire Retail and Leisure Study Appendices C: Health Checks and D: Household Survey Results (Sep 2018)
- ECN06.4 South West Hertfordshire Retail and Leisure Study Appendix E: Statistical Tables - Scenario 1 and 2 (Sep 2018)
- ECN06.5 South West Hertfordshire Retail and Leisure Study Appendix E: Statistical Tables - Scenario 3 (Sep 2018)
- ECN06.6 South West Hertfordshire Retail and Leisure Study Appendices F to J (Sep 2018)
-
Climate Change, Sustainability and Natural Environment (CSN)
- CSN01.1 Chilterns Beechwoods Special Area of Conservation: Mitigation Strategy for Ashridge Commons and Woods Site of Special Scientific Interest (Nov 2022)
- CSN02.1 Visitor Survey, Recreation Impact Assessment and Mitigation Requirements for the Chilterns Beechwoods SAC and the Dacorum Local Plan (Mar 2022)
- CSN03.1 Dacorum Level 1 Strategic Flood Risk Assessment Final Report (Sep 2024) (4.38 MB) (pdf)
- CSN03.2 Dacorum Level 1 Strategic Flood Risk Assessment Appendix A: Planning Policy and Flood Risk Management (Jun 2024) (802 KB) (pdf)
- CSN03.3 Dacorum Level 1 Strategic Flood Risk Assessment Appendix B: A1 (Jun 2024) (34.5 MB) (pdf)
- CSN03.4 Dacorum Level 1 Strategic Flood Risk Assessment Appendix B: A2 (Jun 2024) (27.1 MB) (pdf)
- CSN03.5 Dacorum Level 1 Strategic Flood Risk Assessment Appendix B: A3 (Jun 2024) (28.8 MB) (pdf)
- CSN03.6 Dacorum Level 1 Strategic Flood Risk Assessment Appendix B: B1 (Jun 2024) (27.6 MB) (pdf)
- CSN03.7 Dacorum Level 1 Strategic Flood Risk Assessment Appendix B: B2 (Jun 2024) (28.6 MB) (pdf)
- CSN03.8 Dacorum Level 1 Strategic Flood Risk Assessment Appendix B: B3 (Jun 2024) (30.7 MB) (pdf)
- CSN03.9 Dacorum Level 1 Strategic Flood Risk Assessment Appendix B: C1 (Jun 2024) (27.5 MB) (pdf)
- CSN03.10 Dacorum Level 1 Strategic Flood Risk Assessment Appendix B: C2 (Jun 2024) (31.3 MB) (pdf)
- CSN03.11 Dacorum Level 1 Strategic Flood Risk Assessment Appendix C: Functional Floodplain Delineation Methodology (Jun 2024) (363 KB) (pdf)
- CSN03.12 Dacorum Level 1 Strategic Flood Risk Assessment Appendix D: Site Screening (Jun 2024) (262 KB) (pdf)
- CSN03.13 Dacorum Level 1 Strategic Flood Risk Assessment Appendix E: Local Plan Sites Assessment (Jun 2024) (491 KB) (pdf)
- CSN04.1 Dacorum Level 2 Strategic Flood Risk Main Assessment Report: Final Report (Sep 2024) (851 KB) (pdf)
- CSN04.2 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm01 (North Hemel Hempstead) (Aug 2024) (4.18 MB) (pdf)
- CSN04.3 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm02 (Civic Zone) (Aug 2024) (3.27 MB) (pdf)
- CSN04.4 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm03 (Hemel Hempstead Hospital) (Aug 2024) (2.84 MB) (pdf)
- CSN04.5 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm04 (Paradise) (Aug 2024) (3.05 MB) (pdf)
- CSN04.6 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm05 (Market Square) (Aug 2024) (2.08 MB) (pdf)
- CSN04.7 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm06 (Riverside) (Aug 2024) (3.34 MB) (pdf)
- CSN04.8 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm08 (Hemel Hempstead Station Gateway) (Aug 2024) (2.43 MB) (pdf)
- CSN04.9 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm09 (National Grid and 339-353 London Road) (Aug 2024) (2.74 MB) (pdf)
- CSN04.10 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm10 (Apsley Mills Retail Park) (Aug 2024) (3.29 MB) (pdf)
- CSN04.11 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm11 (Shendish Manor and Fairfields (Aug 2024) (4.05 MB) (pdf)
- CSN04.12 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm13 (Polehanger Lane) (Aug 2024) (3.26 MB) (pdf)
- CSN04.13 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm14 (Marchmont Farm) (Aug 2024) (4.05 MB) (pdf)
- CSN04.14 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm15 (Old Town) (Aug 2024) (2.01 MB) (pdf)
- CSN04.15 Dacorum Level 2 Strategic Flood Risk Assessment: Site Hm16 (Site to the South of Green Lane) (Aug 2024) (2.14 MB) (pdf)
- CSN04.16 Dacorum Level 2 Strategic Flood Risk Assessment: Site Grovehill NDP (Grovehill Local Centre) (Aug 2024) (2.06 MB) (pdf)
- CSN04.17 Dacorum Level 2 Strategic Flood Risk Assessment: Site Bk01 (South of Berkhamsted) (Aug 2024) (2.86 MB) (pdf)
- CSN04.18 Dacorum Level 2 Strategic Flood Risk Assessment: Site Bk02 (British Film Institute) (Aug 2024) (2.47 MB) (pdf)
- CSN04.19 Dacorum Level 2 Strategic Flood Risk Assessment: Site Bk03 (Haslam Playing Fields) (Aug 2024) (2.76 MB) (pdf)
- CSN04.20 Dacorum Level 2 Strategic Flood Risk Assessment: Site Tr01 (Dunsley Farm) (Aug 2024) (2.32 MB) (pdf)
- CSN04.21 Dacorum Level 2 Strategic Flood Risk Assessment: Site Tr02 (New Mill) (Aug 2024) (4.3 MB) (pdf)
- CSN04.22 Dacorum Level 2 Strategic Flood Risk Assessment: Site Tr03 (East of Tring) (Aug 2024) (3.41 MB) (pdf)
- CSN04.23 Dacorum Level 2 Strategic Flood Risk Assessment: Site Mk01 (London Road) (Aug 2024) (3.46 MB) (pdf)
- CSN05.1 South West Hertfordshire Level 1 Strategic Flood Risk Assessment Final Report (Oct 2018)
- CSN05.2 South West Hertfordshire Level 1 Strategic Flood Risk River Ver Addendum (May 2020)
- CSN05.3 South West Hertfordshire Level 1 Strategic Flood Risk Assessment Appendix A: Dacorum A1 (2019)
- CSN05.4 South West Hertfordshire Level 1 Strategic Flood Risk Assessment Appendix A: Dacorum A2 (2019)
- CSN05.5 South West Hertfordshire Level 1 Strategic Flood Risk Assessment Appendix A: Dacorum B1 (2019)
- CSN05.6 South West Hertfordshire Level 1 Strategic Flood Risk Assessment Appendix B: Site Screening (2019)
- CSN05.7 South West Hertfordshire Level 1 Strategic Flood Risk Assessment Appendix C: Understanding Flood Risk in Dacorum (2019)
- CSN05.8 South West Hertfordshire Level 1 Strategic Flood Risk Assessment Appendix D: Cumulative impacts of flood risk (2019)
- CSN06.1 Green Space Strategy 2011-2016 (Jan 2011)
- CSN07.1 Stage 1 Green Belt Review Purposes Assessment Final Report Part 1 (Nov 2013)
- CSN07.2 Stage 1 Green Belt Review Purposes Assessment Final Report Part 2 (Nov 2013)
- CSN07.3 Stage 1 Green Belt Review Purposes Assessment Appendices (Nov 2013)
- CSN07.4 Stage 1 Green Belt Review Purposes Assessment Annex 1.1: Parcel Assessment Sheets for Dacorum Borough Council (Nov 2013)
- CSN07.5 Stage 1 Green Belt Review Purposes Assessment Annex 1.2: Parcel Assessment Sheets for St Albans City and District Council (Nov 2013)
- CSN08.1 Stage 2 Green Belt Review and Landscape Appraisal Report (Jan 2016)
- CSN08.2 Stage 2 Green Belt Review and Landscape Appraisal Annex Report 1: Purpose Assessment Pro Formas (Dec 2016)
- CSN08.3 Stage 2 Green Belt Review and Landscape Appraisal Annex Report 2: Absolute Constraints Pro Formas (Dec 2016)
- CSN08.4 Stage 2 Green Belt Review and Landscape Appraisal Annex Report 3: Non-Absolute Constraints Pro Formas (Dec 2016)
- CSN08.5 Stage 2 Green Belt Review and Landscape Appraisal Annex Report 4: AONB Assessment Pro Formas (Dec 2016)
- CSN08.6 Stage 2 Green Belt Review and Landscape Appraisal Annex Report 5: Landscape Assessment Pro Formas (Dec 2016)
- CSN09.1 Stage 3 Green Belt Review Final Report Part 1 (Aug 2020)
- CSN09.2 Stage 3 Green Belt Review Final Report Part 2 (Aug 2020)
- CSN09.3 Stage 3 Green Belt Review Final Report Part 3 (Aug 2020)
- CSN09.4 Stage 3 Green Belt Review Annex A: Site Pro Formas Part 1 (Aug 2020)
- CSN09.5 Stage 3 Green Belt Review Annex A: Site Pro Formas Part 2 (Aug 2020)
- CSN09.6 Stage 3 Green Belt Review Annex A: Site Pro Formas Part 3 (Aug 2020)
- CSN09.7 Stage 3 Green Belt Review Annex B: Settlement Pro Formas Part 1 (Aug 2020)
- CSN09.8 Stage 3 Green Belt Review Annex A: Site Pro Formas Part 4 (Aug 2020)
- CSN09.9 Stage 3 Green Belt Review Annex B: Settlement Pro Formas Part 2 (Aug 2020)
- CSN09.10 Stage 3 Green Belt Review Annex B: Settlement Pro Formas Part 3 (Aug 2020)
- CSN10.1 Landscape Sensitivity Study Draft Report Part 1 (Apr 2020)
- CSN10.2 Landscape Sensitivity Study Draft Report Part 2 (Apr 2020)
- CSN10.3 Landscape Sensitivity Study Draft Report Part 3 (Apr 2020)
- CSN10.4 Landscape Sensitivity Study Draft Report Part 4 (Apr 2020)
- CSN10.5 Landscape Sensitivity Study Draft Report Part 5 (Apr 2020)
- CSN10.6 Landscape Sensitivity Study Draft Report Part 6 (Apr 2020)
- CSN10.7 Landscape Sensitivity Study Draft Report Part 7 (Apr 2020)
- CSN10.8 Landscape Sensitivity Study Draft Report Part 8 (Apr 2020)
- CSN10.9 Landscape Sensitivity Study Draft Report Part 9 (Apr 2020)
- CSN11.1 Air Quality Action Plan 2015-2018 (Dec 2014)
- Landscape Character Assessment (May 2004)
- Historic Environment (HIS)
-
Healthy Communities (HEA)
- HEA01.1 Indoor Leisure Facilities Needs Assessment (Mar 2019)
- HEA02.1 Leisure Facilities Strategy (May 2019)
- HEA03.1 Open Space Study Assessment Report (Jul 2019)
- HEA04.1 Open Space Study Standards Paper (Jul 2019)
- HEA05.1 Playing Pitch Strategy & Action Plan (Jun 2019)
- HEA06.1 Playing Pitch Strategy Assessment Report (Apr 2019)
- HEA07.1 Playing Pitch Strategy Annual Update 2021 (2021) (1.17 MB) (pdf)
- HEA08.1 Playing Pitch Strategy Annual Update (2023)
-
Design (DES)
- DES01.1 Dacorum Strategic Design Guide Supplementary Planning Document Executive Summary (Feb 2021)
- DES01.2 Dacorum Strategic Design Guide Part 1: Design Process (Feb 2021)
- DES01.3 Dacorum Strategic Design Guide Part 2: Design Principles (Feb 2021)
- DES01.4 Dacorum Strategic Design Guide Part 3: Employment Uses Guidance (Feb 2021)
- DES04.1 Paradise Design Code Supplementary Planning Document (Apr 2023)
-
Transport and Connectivity (TRA)
- TRA01.1 Hemel Hempstead Sustainable Transport Study (Sep 2024) (11.5 MB) (pdf)
- TRA02.1 Berkhamsted and Tring Sustainable Transport Study (Sep 2024) (13.4 MB) (pdf)
- TRA02.2 Berkhamsted and Tring Sustainable Transport Study Appendix A: Challenge Audit - Berkhamsted (Sep 2024) (5.38 MB) (pdf)
- TRA02.3 Berkhamsted and Tring Sustainable Transport Study Appendix B: Challenge Audit - Tring (Sep 2024) (2.13 MB) (pdf)
- TRA02.4 Berkhamsted and Tring Sustainable Transport Study Appendix C: Intervention Proforma - Berkhamsted (Sep 2024) (4.49 MB) (pdf)
- TRA02.5 Berkhamsted and Tring Sustainable Transport Study Appendix D: Intervention Proforma - Tring (Sep 2024) (2.81 MB) (pdf)
- TRA02.6 Berkhamsted and Tring Sustainable Transport Study Appendix E: Intervention Proforma - Wider Area (Sep 2024) (731 KB) (pdf)
- TRA02.7 Berkhamsted and Tring Sustainable Transport Study: Appendix F: Intervention Assessment Framework (Sep 2024) (422 KB) (pdf)
- TRA02.8 Berkhamsted and Tring Sustainable Transport Study Appendix G: Intervention Estimated Costs - Berkhamsted and Tring (Sep 2024) (335 KB) (pdf)
- TRA03.1 Berkhamsted and Tring Sustainable Transport Study Supporting Local Plan 2020-2038 (Nov 2020)
- TRA03.2 Berkhamsted and Tring Sustainable Transport Study Supporting Local Plan 2020-2038 Appendices A & B (Nov 2020)
- TRA03.3 Berkhamsted and Tring Sustainable Transport Study Supporting Local Plan 2020-2038 Appendices C & D (Nov 2020)
- TRA03.4 Berkhamsted and Tring Sustainable Transport Study Supporting Local Plan 2020-2038 Appendices E to G (Nov 2020)
- TRA04.1 Local Plan Transport Modelling (Nov 2024) (31.2 MB) (pdf)
- TRA05.1 Dacorum Local Plan Strategic Transport Modelling Report Final Draft (May 2020)
- TRA06.1 South West Hertfordshire Growth and Transport Plan Prospectus (Jun 2019)
- TRA07.1 2036 COMET Dacorum Local Plan Scenario (Apr 2018)
- TRA08.1 Hertfordshire's Local Transport Plan 4 2018-2031 (May 2018)
- TRA09.1 Hertfordshire's Transport Vision 2050 (2016)
-
Site Selection and Allocation (SSA)
- SSA01.1 HELAA Update 2024 - Main Report.pdf (1.18 MB) (pdf)
- Interactive Map to support HELAA Update 2024 & Appendices (LINK)
- SSA01.2 HELAA Update 2024 - Appendix A Amended, Deleted and New Sites.pdf (454 KB) (pdf)
- SSA01.3 HELAA Update 2024 - Appendix B Review of Existing Allocations.pdf (8.81 MB) (pdf)
- SSA01.4 HELAA Update 2024 - Appendix C Detailed Site Assessment.pdf (4.87 MB) (pdf)
- SSA02.1 Revised Strategy for Growth Strategic Housing Land Availability Assessment Update Main Report (Oct 2023)
- SSA02.2 Revised Strategy for Growth Strategic Housing Land Availability Assessment Update Appendix A: Amended, Deleted and New Sites (Oct 2023)
- SSA02.3 Revised Strategy for Growth Strategic Housing Land Availability Assessment Update Appendix B: Review of Existing Housing Allocations (Oct 2023)
- SSA02.4 Revised Strategy for Growth Strategic Housing Land Availability Assessment Update Appendix C: Phase 2 Assessment (Oct 2023)
- SSA03.1 Site Assessment Study Volume 1: Main Report (Jan 2020)
- SSA03.2 Site Assessment Study Volume 2: Design Case Studies (Jan 2020)
- SSA03.3 Site Assessment Study Volume 3 Part 1: Final Site Schedules (Jan 2020)
- SSA03.4 Site Assessment Study Volume 3 Part 2: Final Site Schedules (Jan 2020)
- SSA03.5 Site Assessment Study Volume 3 Part 3: Final Site Schedules (Jan 2020)
- SSA03.6 Site Assessment Study Volume 4: Viability (Dec 2019)
- SSA03.7 Site Assessment Study Addendum (Nov 2020)
- SSA04.1 Urban Capacity Study (including Windfall Assessment) Main Report (Nov 2020)
- SSA04.2 Urban Capacity Study Appendix A: Review of Existing Housing Allocations (Nov 2020)
- SSA04.3 Urban Capacity Study Appendix B: Site Assessment Proformas Berkhamsted (Nov 2020)
- SSA04.4 Urban Capacity Study Appendix B: Site Assessment Proformas Bovingdon (Nov 2020)
- SSA04.5 Urban Capacity Study Appendix B: Site Assessment Proformas Hemel Hempstead (Nov 2020)
- SSA04.6 Urban Capacity Study Appendix B: Site Assessment Proformas Kings Langley (Nov 2020)
- SSA04.7 Urban Capacity Study Appendix B: Site Assessment Proformas Markyate (Nov 2020)
- SSA04.8 Urban Capacity Study Appendix B: Site Assessment Proformas Tring (Nov 2020)
- SSA04.9 Urban Capacity Study Appendix C: Historic Windfall Data (Nov 2020)
- SSA04.10 Urban Capacity Study Appendix D: Sites with the potential for allocation in the new Local Plan (Nov 2020)
- SSA05.1 Employment Land Availability Assessment Main Report (Oct 2017)
- SSA05.2 Employment Land Availability Assessment Appendices A: Plan of Sites and B: Town Centre Cluster Plans (Oct 2017)
- SSA05.3 Employment Land Availability Assessment Appendix C: Site Assessments (Oct 2017)
- Infrastructure Delivery (INF)